|
|
|
|
|
|
|
|
|
|
|
other services
Fist official pile In order to make a festive occasion of a first pile, we have an antique manual pile-driving rig available. As many as 8 people can be invited to simultaneously drive in the first official pile. Naturally, a modern pile-driving rig can also be used to drive the first pile.
Pile trimming We can also take care of the pile trimming of all our piles for you. A hydraulic cutter can be used to remove the reinforcement from every height to a maximum of 2 centimetres above the ground. The main and head reinforcement are not damaged by this. If necessary, manual trimming can also be performed. In this case, various measures are taken to prevent the pile from cracking.
Acoustic testing
The acoustic testing of our piles is performed by an experienced independent company. Measuring signals from these pile checks are shown digitally and recorded. After processing these measurements, a report is produced containing a definite conclusion on the quality of the measured pile. Any discontinuities such as bulges, cracks or narrowings are thus identified in good time. Testing provides additional assurance!
Enforcement and load calculations Enforcement and load calculations can be made by utilising the analysis and interpretation of geotechnical data. Furthermore one piling system can be substituted by another system if this has for example a shorter lead time, better meets the permit requirements or fullfills the wishes of the (permit) authorities.
As you can see, Kuipers Funderingstechnieken BV is at home in a variety of markets!
|
| |
Print |
|
| |
|
|
| |
|
|
|
|